Currently I am working as a Team Lead (operation & maintenance) at Wellhead Compression and Produce Water Treatment & Injection Facilities.
•
Part of Manzalai secondary compression facility project.
•
I also have work experience of the RELOCATION of MAKORI EPF TO TOLANAJ (MOL Pakistan Oil & Gas CO. B.V).
•
Was also Part of installation and commissioning of Front-End Booster Compressors
Duration: September 2016 to present
Overseeing maintenance of rotary equipment, i.e. engines, reciprocating PD compressors at MOL Pakistan and advice troubleshooting and areas of improvements wherever required. Leading a team of 32 team members of instrument and Mechanical technicians and Process Operator.
•
Leading maintenance/troubleshooting of following rotary equipment’s.
a.
Waukesha Engines (L5974 GSI (ESM2)
b.
CAT Engines (C15, C4)
c.
Superior Engines (16SGTD)
d.
Kohler Engines (1100RZG)
e.
Ajax Compressors (DPC2804)
f.
Ariel Compressors (KBK4, JGT2)
g.
GE-Gemini FS604 Compressor
h.
Superior Compressors ( MH64, WG74, and WH64)
•
Planning & execution of major activities of rotating equipment. Following major activities have been performed
a.
Major PM: AJAX DPC2804.
b.
Waukesha L5974 GSI (ESM2).
c.
Major 48k PM: Ariel JGT2.
•
Supporting engineering team in spares review w.r.t min/max, consumption etc. to avoid stock outs.
•
Supporting P&S team in defining PM plans in CMMS. Maximo operation, Work order/Material and service request arrangement.
•
Offsites Portacabin Electrical party audit and electrical equipment’s and appliances audit.
•
Participation in commissioning phase of new packages, i.e. FAT.
•
ATAs: Safe execution at MOL Offsites facilities during 2017-2023.
•
Support to engineering team for yearly CAPEX/OPEX of rotary equipment.
•
Development of JSAs, TRAs, LMRAs & PTW docs for routine jobs.
•
Development of different operation related SOPs and operation procedures.
•
Development of Monthly Flow Reports and Shutdown Summary
•
Troubleshooting and diagnostic of Wellhead compression units and Produce water treatment Plant
•
Operation and troubleshooting experience on ESM2, MURPHY, and ALLEN BRADLAY control panels and Siemens simatic s7-300 Controller.
•
Preparing and Sharing Daily Progress reports with BO.
•
Good working experience of complete installation, Pre- commissioning and commissioning/maintenance and operation of below Rotary machines:
a.
AJAX DPC-2804 integral compressors.
b.
Arial Compressor KBK 4 and Waukesha Engine L5974 GSI (ESM2).
c.
GE-Gemini FS604 Compressor.
d.
HDP 255 process plunger pump – Hammalman and all other types of pumps
•
Complete Installation of MURPHY 50-30-10053, ALLEN BRADLAY control panels, and its program uploading and downloading.
•
Complete process operation and controlling of process variables
•
Operation and maintenance of said compressors and process plant.
•
Good experience of working on the field instruments, pneumatic level switches, electrical level, thermocouples, RTD, thermostats, pressure control switches, digital no Flow timers, Accelerometer, Vibration Transmitter and different types of Analyzers.
•
Good experience on different kind of pressure regulators, Flow and pressure control valves, I/P convertor /Fire and Gas detector.
DESCON ENGINEERING (PVT) LTD
Duration: 1 March 2013 to June 2014.
Manzalai Gas Processing Facilities, MOL Pakistan Oil & Gas CO. B.V, Banda Duad Shah, Karak, Khyber Pakhtunkhwa, Pakistan Designation: Assistant Engineer (Electrical & Instrumentation)
Responsibilities:
•
DCS, ESD and PLC system Installation.
•
RTU panel installation
•
Installation of Instruments and Pre- commissioning.
•
Good Knowledge of electrical and instruments drawings and P&D and Leader logic.
•
Earthling and Lightening Works EXPERIENCE PROFILE
•
I have worked as E & I Engineer with DESCON Engineering. The prime responsibilities are,
•
Study the design to prepare construction methodologies in consultation with construction management team.
•
Prepare/Monitor working plans & prepare weekly, monthly and quarterly look ahead plans.
•
Attain approvals for material from client/Consultant.
•
Coordination facilitator between the teams of Executions & QA/QC.
•
Align Supervisory work force to carry out daily activities.
•
Target Orientation to the Supervisory force.
•
Over all supervision of all Electrical and instrumentation pre/post installation.
•
Preparation of Project handing over pre/post commissioning protocols.
•
Responsibilities also to ensure maintenance of good quality and safety standard at site.
A BRIEF DUTIES ARE AS UNDER
•
Marshalling & System Cabinet (Honeywell C300) of DCS and their cable termination.
•
Transformers, UPS System and DC Batteries Installation Cable Terminations.
•
Installation of all types of instruments as per P&ID and their Hook ups and detail specifications.
•
Installation and Troubleshooting of all type of instruments
•
Field Instruments Junction Boxes (JB) installations and cables terminations
•
Has been the part of Cold Loop and testing from instrument to JB to Panels
•
Development of QIP and ITP.
•
Preparation of method statement for electrical and instrumentation work.
•
Inspection/witness of Lighting Installation and Earthling System Installation.
•
Inspection/witness of Cable Laying and cable testing (Insulation, Continuity Test).
•
Inspection/witness of J.B`s & Panel Installation & Termination.
•
Preparation of test reports and get approval from client.
•
Carried out walk through with client for final inspection.
•
Reports to the QA/QC In charge.
•
Close coordination with site Execution team for any design issues and their Technical assistance.